Drawing & Design Approval / Form 1A

Get your factory building plans, plant layout, and machinery drawings approved by the Chief Inspector of Factories without delay. AK Industrial Solution prepares, reviews, and submits your Form 1A drawings in full compliance with the Factories Act, ensuring your project moves from design to construction without regulatory roadblocks.

Accurate Drawing Preparation

We prepare site plans, building layouts, and machinery placement drawings strictly as per Factories Act and Form 1A specifications, minimizing the chances of rejection or resubmission.

Fast-Track Approval Process

Our team liaises directly with the Factories Department to track your application status and resolve queries quickly, cutting down approval timelines significantly.

Compliance with National Building Code

Every drawing we submit is cross-checked against NBC standards, fire safety norms, and state-specific factory building regulations before it goes for approval.

End-to-End Documentation Support

From initial site measurement to final approved copy, we handle drafting, technical calculations, and all supporting documents required for Form 1A submission.

Services

Our Drawing & Design Approval Services

Site Layout & Building Plan Drawings

Preparation of factory building plans, plot layout, and floor plans as per statutory format.

Machinery Layout Drawings

Detailed placement plans for plant and machinery, safety clearances, and material movement paths.

Form 1A Application Filing

Complete preparation and submission of Form 1A along with all mandatory annexures.

Liaison with Factories Department

Coordination with inspecting authorities to address objections and speed up approval.

Revised & Amendment Drawings

Support for approval of modified layouts when factories expand or restructure operations.

Testimonials

What Our Customers Says

testimonial 01
Rajesh Kumar

Safety Manager, Heavy Manufacturing Plant, Indore

“Our factory was struggling with outdated emergency procedures until AK Industrial Solution conducted a comprehensive OEP assessment. Their team identified critical gaps in our evacuation routes and redesigned our emergency protocols. Post-implementation, our mock drill showed a 40% improvement in evacuation time. Highly recommended!”

testimonial 02
Priya Sharma

Operations Director, Chemical Manufacturing, Bhopal

“The OEP they created for our chemical processing unit is thorough and extremely practical. Their team trained all 150+ workers on proper evacuation procedures and emergency response roles. During a recent near-incident, our team responded flawlessly because everyone knew exactly what to do. This plan could have saved lives.”

testimonial 02
Vikram Patel

Plant Head, Petrochemical Facility, Vadodara

“We needed an OEP that would pass regulatory inspection and actually work in a real emergency. AK Industrial Solution delivered both. Their mock drills were tough, identified realistic gaps, and their continuous improvement approach means our plan stays relevant as our facility evolves. Trusted partner.”

Need Your Factory Drawings Approved Without Delay?

Avoid construction hold-ups and compliance penalties. Let AK Industrial Solution handle your Drawing & Design Approval / Form 1A process from start to finish, so your project stays on schedule.

Scroll to Top